Skip to content
GitLab
Projects Groups Topics Snippets
  • /
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
  • Sign in
  • C Cspec Editor
  • Project information
    • Project information
    • Activity
    • Members
  • Wiki
    • Wiki
  • Snippets
    • Snippets
  • Activity
Collapse sidebar
  • ClinGenClinGen
  • cspec
  • Cspec Editor
  • Wiki
  • Home

Home · Changes

Page history
Update home authored Jul 05, 2022 by Neethu Shah's avatar Neethu Shah
Hide whitespace changes
Inline Side-by-side
home.md
View page @ 40b02c9c
......@@ -80,7 +80,7 @@ One can access the specification document page by clicking the pencil icon at th
Sections of a specification document are:
### General Metadata
Metadata about the specification include the title, version, current status, etc,.
A specification document goes through a series of stages, right from when a new document is created. These transitions in stages are displayed at this section as breadcrumbs and an example is shown below.
A specification document goes through a series of stages, right from when a new document is created. These stage transitions are displayed at this section as breadcrumbs and an example is shown below.
![stateTransitions](uploads/9b2442804e7e6e414cbe6c8cd45df075/stateTransitions.png)
#### Changing the status of the document
One can change the status of the document using the tool option at the top right hand side and this feature is designed to respond based on the permissions a user has.
......@@ -91,7 +91,7 @@ For instance a _VCEP coordinator_ can submit the document in _Classification Rul
<kbd>
![status2](uploads/25dbaec9e67d004554e5641e851e3e8c/status2.png)
</kbd>
Once submitted, a coordinator can no longer make edits to that document. To make further edits the submission has to be withdrawn choosing the option _Withdraw Classification Rules Submitted_. Similarly, an _SVI approver_ can approve OR review ( not approved ) the submitted document to move the status to the next stage, _Pilot Rules In Prep_ or _Classification Rules In Prep_ respectively.
Once submitted, a coordinator can no longer make edits to that document. To make further edits the submission has to be either a) withdrawn - choosing the option _Withdraw Classification Rules Submitted_ or b) must be formally approved by the SVI approver. Similarly, an _SVI approver_ can approve OR review ( document returned without approval ) the submitted document to move the status of a document to the next stage, _Pilot Rules In Prep_ or _Classification Rules In Prep_ respectively.
### Scope
### Criteria & Strength Specifications
A VCEP coordinator or a member can edit the _Criteria & Strength Specifications_ table. Details can be found [here](/Criteria-And-Strength-Specifications)
......
Clone repository
  • Administrator Related
  • Criteria And Strength Specifications
  • Rules for Combining Criteria
  • SVI Reviewer Related
  • Specification types
  • Home