... | ... | @@ -95,7 +95,7 @@ Once submitted, a coordinator can no longer make edits to that document. To make |
|
|
### Criteria & Strength Specifications
|
|
|
A VCEP coordinator or a member can edit the _Criteria & Strength Specifications_ table. Details can be found [here](/Criteria-And-Strength-Specifications)
|
|
|
## Reopen a previously released/existing specification document
|
|
|
A _Released_ specification document must be reopened in order to make further edits. The document then must be versioned and submitted for approval. To reopen the document use the tool option on the top right hand side of the specification document.
|
|
|
A _Released_ specification document must be reopened in order to make further edits. The document then must be versioned and submitted for approval. To reopen the document use the tool option on the top right hand side of the specification document. Once reopened the document status will be _Pilot Rules In Prep_
|
|
|
<kbd>
|
|
|
![Screen_Shot_2022-07-04_at_3.33.30_PM](uploads/47d2db450e52c63aa86818440840908e/Screen_Shot_2022-07-04_at_3.33.30_PM.png)
|
|
|
</kbd>
|
... | ... | @@ -103,3 +103,10 @@ A _Released_ specification document must be reopened in order to make further ed |
|
|
|
|
|
Once a reopened document has been edited, it must be submitted for approval by submitting the document. Click the tool option, as shown below at the top right hand side of the document to _submit_ your document.
|
|
|
![piprep_submit1](uploads/e211a8ce680ec002beb6500dc5f3bcf3/piprep_submit1.png)
|
|
|
|
|
|
This tool will launch a modal as show below. Please mark the following:
|
|
|
1. Correct version (minor or major with respect to the changes made)
|
|
|
2. Release notes
|
|
|
3. Click the submit button which will place the document in _Pilot Rules Submitted_
|
|
|
|
|
|
![re-submit](uploads/edbfeff4294928e01d2a59444e5f51eb/re-submit.png) |