Sections of a specification document are:
|
|
Sections of a specification document are:
|
|
### General Metadata
|
|
### General Metadata
|
|
Metadata about the specification include the title, version, current status, etc,.
|
|
Metadata about the specification include the title, version, current status, etc,.
|
|
A specification document goes through a series of stages, right from when a new document is created. These transitions in stages are displayed at this section as breadcrumbs and an example is shown below.
|
|
A specification document goes through a series of stages, right from when a new document is created. These stage transitions are displayed at this section as breadcrumbs and an example is shown below.
|
|
![stateTransitions](uploads/9b2442804e7e6e414cbe6c8cd45df075/stateTransitions.png)
|
|
![stateTransitions](uploads/9b2442804e7e6e414cbe6c8cd45df075/stateTransitions.png)
|
|
#### Changing the status of the document
|
|
#### Changing the status of the document
|
|
One can change the status of the document using the tool option at the top right hand side and this feature is designed to respond based on the permissions a user has.
|
|
One can change the status of the document using the tool option at the top right hand side and this feature is designed to respond based on the permissions a user has.
|
... | @@ -91,7 +91,7 @@ For instance a _VCEP coordinator_ can submit the document in _Classification Rul |
... | @@ -91,7 +91,7 @@ For instance a _VCEP coordinator_ can submit the document in _Classification Rul |
|
<kbd>
|
|
<kbd>
|
|
![status2](uploads/25dbaec9e67d004554e5641e851e3e8c/status2.png)
|
|
![status2](uploads/25dbaec9e67d004554e5641e851e3e8c/status2.png)
|
|
</kbd>
|
|
</kbd>
|
|
Once submitted, a coordinator can no longer make edits to that document. To make further edits the submission has to be withdrawn choosing the option _Withdraw Classification Rules Submitted_. Similarly, an _SVI approver_ can approve OR review ( not approved ) the submitted document to move the status to the next stage, _Pilot Rules In Prep_ or _Classification Rules In Prep_ respectively.
|
|
Once submitted, a coordinator can no longer make edits to that document. To make further edits the submission has to be either a) withdrawn - choosing the option _Withdraw Classification Rules Submitted_ or b) must be formally approved by the SVI approver. Similarly, an _SVI approver_ can approve OR review ( document returned without approval ) the submitted document to move the status of a document to the next stage, _Pilot Rules In Prep_ or _Classification Rules In Prep_ respectively.
|
|
### Scope
|
|
### Scope
|
|
### Criteria & Strength Specifications
|
|
### Criteria & Strength Specifications
|
|
A VCEP coordinator or a member can edit the _Criteria & Strength Specifications_ table. Details can be found [here](/Criteria-And-Strength-Specifications)
|
|
A VCEP coordinator or a member can edit the _Criteria & Strength Specifications_ table. Details can be found [here](/Criteria-And-Strength-Specifications)
|
... | | ... | |